Time to read
less than1 minute
Jon’s Ramblin’s
Highway repairs
The new bridge over Kingfisher Creek is nothing short of awesome.
I’m wondering how long it will take the DOT to take down the construction zone signs; seems like it normally takes awhile.
I read an article in this paper a DOT spokesman said he was pleased with the traffic flow on the 81 highway construction. I have news for that person. It’s like a Chinese fire drill. You evidently haven’t driven it much, if at all. I understand the weather has caused delays and it looks like more delays and construction shutdowns in the very near future. Then the southbound lanes will be replaced. More Chinese fire drill.
’Nuff said.
God bless America,
Jon Cochran Sr.